What We Do

Services

Everything we build, fix, and maintain, start to finish.

Home › Services

Everything we take on

Every job below is one we do ourselves across Pascagoula.

Deck Installation

We frame new decks with pressure-treated pine joists set on concrete footings poured below grade. Ledger boards get flashed where they meet the house, so rain doesn't find its way into the rim joist. We size everything for the wind loads Jackson County inspectors look for, not just what holds up a backyard party.

Deck Repair

Soft spots, wobbly railings, and sunken posts all mean something underneath has failed. We replace rotted joists and ledger boards rather than just swapping out the surface boards on top. Most repair calls start with us pulling a board to see how far the rot actually goes.

Deck Staining & Sealing

Gulf Coast sun and humidity gray out wood fast and grow mildew in the gaps between boards. We pressure wash, let the wood dry out fully, sand down the rough spots, then apply a semi-transparent stain and sealer. Plan on doing this again every two to three years out here, not five.

Custom Deck Design

Some yards call for more than a rectangle off the back door. We've built multi-level decks that step down with the yard, built-in bench seating, and framing for pergolas and outdoor kitchens. We'll draw it out and price it before any lumber gets ordered.

Composite Decking Installation

Composite boards like Trex or TimberTech cost more up front but don't rot, splinter, or need repainting. We install them with hidden fastener systems so you don't see a single screw head on the surface. It's the material we push hardest for anyone tired of refinishing a wood deck every couple of years.

Deck Railing Installation & Repair

Railings take the most abuse of anything on a deck, kids lean on them, dogs jump at them, storms rattle them loose. We build to the baluster spacing code requires, four inches max, and anchor posts so they don't wiggle after a year. We also repair railings on decks we didn't build originally.

Deck Resurfacing

If the frame underneath is still solid, you don't need a full rebuild, just new boards on top. We pull the old decking, check every joist while it's exposed, and lay new boards with the right gap for drainage and expansion. It's usually a fraction of the cost of tearing the whole thing down.

Screened-In Deck Construction

No-see-ums and mosquitoes make a lot of Gulf Coast decks unusable at dusk. We frame a roof structure that ties into the house and screen in the sides, so you get the deck back for evenings without getting eaten alive. This is one of the most requested upgrades we do.

Deck Demolition & Removal

Sometimes the right move is to tear the old deck out rather than patch it again. We demo the structure, check what's left of the footings to see if they're worth reusing, and haul off everything so you're not stuck with a pile of old lumber in the yard.

Multi-Level Deck Construction

Yards that slope need stairs and landings built to code, with rise and run that doesn't trip people up in the dark. We build multi-level decks that follow the grade instead of fighting it, with stringers cut for the actual slope, not a standard guess.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Pascagoula, MS

We send crews out to these towns on a regular basis.

Pascagoula, MS
Gulfport, MS
Biloxi, MS
Ocean Springs, MS
Gautier, MS
Long Beach, MS
Moss Point, MS
D'Iberville, MS
Pass Christian, MS
Vancleave, MS
Lucedale, MS
Common Questions

Things worth asking

Questions that come up once a project actually starts.

Do I need a permit to build a deck?
Most decks attached to a house and built above a certain height require a building permit in Jackson County, Mississippi, along with an inspection of the footings before decking goes on. A contractor familiar with local code can pull the permit and schedule inspections as part of the job.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from footings to final board, depending on size and weather. Multi-level decks, screened enclosures, or custom built-ins add extra days for additional framing.
Can you work within a specific budget?
Yes, material choice is the biggest lever on price, pressure-treated pine costs significantly less than composite decking, and simplifying the railing or skipping a second level can bring a quote down. A contractor can price out a few options side by side.
Do you guarantee your work?
Reputable deck contractors back their labor with a workmanship warranty separate from the manufacturer's warranty on materials like composite decking or fasteners. Ask what's covered and for how long before signing a contract.
Who will I be dealing with during the job?
On most deck projects, the crew lead or project contact is the same person from the initial walkthrough through the final inspection, rather than a rotating cast of subcontractors.
What decking materials do you work with?
Common decking materials include pressure-treated pine, cedar, and composite brands like Trex or TimberTech, each with different cost, lifespan, and upkeep. Pressure-treated pine requires restaining every few years; composite requires very little, though it costs more upfront.
Can I still use my yard while the deck is being built?
Yes, most of the yard stays usable during a deck build, though the immediate work area will have tools, lumber, and some noise during the day. Pets and small children should be kept clear of the footing holes and framing area until it's secured.
How should I prepare the site before work starts?
Clearing furniture, grills, and planters off the existing deck or the build area, and marking any sprinkler lines or buried cables, speeds up the start of a deck project. A contractor will usually flag anything else that should be moved during the initial site visit.
What if you find rot or a bad footing once the old deck comes off?
Hidden rot in a ledger board or an undersized footing is common once old decking is removed, and a contractor should flag it and get approval before doing any additional repair work beyond the original quote. This is one reason final cost can shift once demolition starts.
How do I maintain a new deck?
A pressure-treated or cedar deck should be cleaned and resealed every two to three years in a humid coastal climate to prevent graying and mildew. Composite decking only requires an occasional wash with soap and water, no sealing or staining required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (228) 335-6448